Since the launch of the company’s 6S on-site management pilot program, the Twisting Workshop of Production Department IV has completed three key stages: preparation and planning, company-wide awareness and training, and comprehensive rectification and implementation. After four months of targeted efforts, significant progress has been achieved in areas such as the on-site working environment, fixed-position management, employee operational compliance, and safety risk prevention and control. Starting June 1, the workshop officially entered a six-month normalized control phase, with the goal of “strict inspections, strong consolidation, enhanced discipline, and long-term effectiveness”, driving the transformation of 6S management from “intensive rectification” to “routine and sustained practice”.
During the earlier phase, the workshop foc
sed on addressing pain points in on-site management and safety governance. Through measures such as functional area planning, improved signage and labeling, reinforced grid-based governance, full-staff training, and hazard identification, issues such as random material stacking and improper wearing of personal protective equipment (PPE) were effectively resolved, laying a solid foundation for normalized implementation.
In the normalized control phase, the workshop will establish a three-dimensional inspection model consisting of daily patrols by grid safety officers, weekly spot checks by the workshop, and monthly specialized inspections. Key routine inspection items will include fixed-position management, equipment compliance, environmental cleanliness, proper PPE wearing, and hazard identification. An accountability mechanism linking inspection results to employee performance will also be put in place, using stringent assessments to drive responsibility fulfillment.
Going forward, the workshop will continue to pursue the pilot program’s objectives, conduct in-depth analysis of frequently recurring issues, optimize control measures, and strive to build a replicable and scalable 6S management model, accumulating practical experience for the company-wide rollout of standardized 6S management.